Client Feedback

Broadstone Baptist Church

On behalf of Broadstone Baptist Church I want to express our thanks for all that you have done to bring this building to completion. We appreciate that it hasn’t been easy but there have been a lot of positive comments about the design and finish of the building from residents of Broadstone. As a church we are delighted with the finished building, although we appreciate that there still a few snags and commercial items to be tied up. I feel we have a great looking building, which makes a very positive impact on York Road.

Rev Tim Gamston (Pastor)

Stroud School

It is an understatement to say that everyone is most impressed with the new facilities, and all achieved with the herculean efforts of Steve Manville, Tim Godden, Wayne Siney and Ian Smicle-Thompson, and in time for occupation in September.

RBB can be justly proud of the team, who have been excellent ambassadors for the company and for whom I would have no hesitation in recommending to future clients, quite simply ‘they get on with the job’

Keith Goldie, Operations Manager

Pilgrims Cross School

I have found Raymond Brown to be highly professional and approachable company and would be happy to both work with them and recommend them, for future school and academy projects.

Raymond Brown are a company with a ‘family ethos’, who have high standards and are always seeking to provide the best possible service to our school and the Diocese.

Amanda Johnston, Headteacher

Hounsdown School

I have  been involved with many building projects, mainly new builds, in different schools/academies but  this  project has probably been the most logistically challenging. Mike and his team have risen to these challenges on a daily basis. Mike has coped with all challenges in a calm, efficient and good humoured way with the result that the project has gone exceptionally smoothly and the finished product looks really good.  The site has also been safe, secure and tidy throughout the construction period – exceptionally important at all times but especially when children are constantly moving around – it has been good to have such a reliable team maintaining high standards.

Liz Wagner, Schools Project Manager

Priestlands School

“I cannot thank Lewis enough for his hard work and dedication. The quality of workmanship is excellent and the project was completed on time, on budget and to a very high standard.”

Carole Gibbs

Cornerstones Primary School

“I wanted to take this opportunity to thank you and your team for completing this very significant project for us. I have received excellent feedback about your willingness to take on the challenge after we had terminated the previous contract.”

Steve Clow, Hampshire County Council

Mountbatten School

“I am writing to express our gratitude for the quality of work, both inside and out, for the close attention to detail, and for the careful management of the project by Justin Carr.”

Christopher Cox

Portsmouth College

“The primary site management was excellent with the Raymond Brown directly employed site manager performing better than any we have experienced on our previous projects. All Raymond Brown directly employed staff were focused on providing the College with a high level of service.”

Peter Rudd

Archbishop Wake CE School

This is the third time I have been involved in a school building project and I cannot speak highly enough of the service provided by Raymond Brown and particularly, Tim and Steve. Certainly, if we had a project in the future, I would not hesitate to use the company again and I would be very happy to recommend Raymond Brown to others.

Jo Hicks

Petersfield Library

From the start it was clear that Phil Pinhorne, Project Manager, Wayne Siney, Site Manager and I all wanted the same outcome and that we were going to work well together to achieve the goal.

Samantha Todd